An example of using the poka-yoke technique in process design is
A) Reducing the number and type of fasteners
B) Using standardized tooling
C) Using tooling to prevent a part from being inserted upside down
D) Eliminating bill of material levels
Correct Answer:
Verified
Q2: Reduced setup has which of the following
Q3: Which of the following statements is true?
I.
Q4: Overproduction causes waste by:
A) consuming unneeded raw
Q5: A pull system is developed to provide
Q6: The buyer expects that a supplier will
Q8: Which of the following statements is best?
I.
Q9: If a company standardizes on the components
Q10: Which of the following statements is best
Q11: Which of the following contribute to machine
Q12: Which of the following are advantages of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents