The demand-pull system requires goods to be manufactured based on the
A) current demand.
B) anticipated demand.
C) previous year's demand.
D) average of the next five years' demand.
Correct Answer:
Verified
Q5: JIT reduces lead times to meet delivery
Q14: JIT avoids shutdowns due to materials shortages
Q50: In comparison to a traditional environment, a
Q51: Under JIT, the number and magnitude of
Q52: _ are costs of activities performed because
Q56: The Kanban system controls inventory through the
Q57: How can JIT avoid shutdowns?
A)increase in defective
Q58: A withdrawal Kanban specifies
A)how much should be
Q59: Which of the following is NOT a
Q60: _ are the costs of activities executed