The risk of assessing control risk too high is the risk that the evidence of compliance with control procedures in the sample indicates
A) Low control risk when the actual degree of compliance does not justify a low control risk assessment.
B) Low control risk when the actual degree of compliance justifies a low control risk assessment.
C) High control risk when the actual degree of compliance would justify a lower control risk assessment.
D) High control risk when the actual degree of compliance would justify a higher control risk assessment.
Correct Answer:
Verified
Q16: The set of all of the elements
Q18: Which of the following audit procedures is
Q18: Which description best illustrates sampling risk?
A) Applying
Q19: When performing the substantive tests on an
Q23: If the association of population items with
Q25: When auditors perform procedures using statistical sampling
Q25: Which of the following is used in
Q26: Detection risk is the risk that the
Q40: Auditing a larger sample reduces the probability
Q50: Non-sampling risk exists in both statistical and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents