In PERT,the activity duration time is equal to the
A) pessimistic time.
B) optimistic time.
C) most likely time.
D) mean duration.
Correct Answer:
Verified
Q50: Use the following network of related activities
Q51: A project network is shown below.Use a
Q52: Use the following network of related activities
Q53: National Oil Company (NATOCO)must plan the shutdown
Q54: Marcy Fetter,a staff analyst at the Los
Q55: Three paths of a PERT network have
Q56: A senior MIS design class project team
Q57: For the project represented below,determine the earliest
Q58: Use the following network with activities and
Q60: A project has the following activities,durations,costs,and precedence