Two delivery methods have been proposed for a standard delivery method for new bridge constructions in Oregon to overcome traditional design- bid- build models that do not adequately account for site conditions and constructability, and often lead to additional expenses. One alternative must be selected to represent the delivery method specified in the RFP. Based on data from recent bridge construction projects of comparable size, we can estimate the savings from reduced redesign costs, risk management costs, and overhead costs during the life of the construction contract over the traditional delivery model. The estimated costs of a 18- month contract are the following: Which alternative should be selected based on the present worth method? Use a MARR of 4%, compounded monthly. Assume other benefits and costs are negligible.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q4: Two flash vaporizer machines are considered
Q5: Compare the alternatives shown below on
Q6: Cassandra sets up a savings plan for
Q7: Two advanced thermal insulating and anti-
Q8: A leading cancer research institution received a
Q10: Consider the three mutually exclusive alternatives
Q11: An insulated shipping container supplier is
Q12: A textile company is considering opening a
Q13: Nadia recently moved to Celebration, Florida,
Q14: HealthRx, a major manufacturer of non-
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents