The Initial Cost of Constructing a Flood Control Dam Is

Question 7

Essay

The initial cost of constructing a flood control dam is estimated to be $5 million, with annual upkeep costs of $340,000. Annual benefits (e.g., reduced flood damage, agricultural development, and tourism, etc.) are expected to be $1.25 million, whereas the disbenefits from significant ecological and human social changes are expected to be $0.025 million per year. Assume the dam will have a useful life of 53 years. At an interest rate of 17% per year, should the dam be constructed on the basis of its conventional B- C ratio, with AW as the equivalent- worth measure?

Correct Answer:

verifed

Verified

Conventional B- C = ...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents