Strato Engineering (Scenario) Recently Strato Engineering, a Technology Product Company, Began the Use
Strato Engineering (Scenario)
Recently Strato Engineering, a technology product company, began the use of a team (1) to develop the next generation of the company's model CVF-D. The team is composed of the product development manager, chief engineer, director of procurement, human resource director technology, marketing research director, cost analysis director, operations director production, and the four highest-dollar project vendors. The preliminary projection for the lifetime of the team to prototype-production is expected to be 2 years due to the level of technology involved in the product. Another team (2) has also been established recently to solve a new problem with an adhesive used to attach a thin-foil material to a finished metal surface. There are three members in this team: installer, engineer, and sales representative for the adhesive manufacturer, and no one particular leader. It is anticipated that it will require about 2 days to solve the problem. Another team (3) has been working together for 4 years implementing modifications to the company's current model CVF-C. It is composed of members in the areas of: procurement, engineering, production, major vendors, and Strato Engineering customers' procurement agents. None of the members of this team are at the same location. They utilize a variety of graphic-electronic technologies to view the product onscreen in three-dimension at each location simultaneously. At the Denver facility, a team (4) has been formed to stamp a new part. It requires four members, and they rotate jobs every 2 hours. Before beginning the workday, they meet for about 10 minutes and discuss the work that needs to be completed that day. The team makes most of the day-to-day decisions about their work responsibilities.
-Team 1 that is working on the model CVF-D is a ________ team.
A) virtual
B) self-managed
C) problem-solving
D) cross-functional
Correct Answer:
Verified
Q129: Conflicting Opinions (Scenario)
Two vice presidents were in
Q130: Midway through his first semester, one of
Q131: After Samir's students left his office he
Q132: In Samir's first faculty meeting, his reluctance
Q133: The reluctance of Samir's senior professors to
Q135: Kangaroo (Scenario)
Kangaroo Manufacturing Co. has been utilizing
Q136: Conflicting Opinions (Scenario)
Two vice presidents were in
Q137: Kangaroo (Scenario)
Kangaroo Manufacturing Co. has been utilizing
Q138: The New Professor (Scenario)
Samir has recently received
Q139: The Retreat (Scenario)
The first-line managers were sent
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents