Lead time remaining includes all elements of manufacturing lead time and expresses the amount of time a job normally takes to completion.
Correct Answer:
Verified
Q19: Dispatching rules should not be simple to
Q20: What is the objective of scheduling? Discuss.
Q21: Time saved at a non- bottleneck saves
Q22: The objectives of production activity control are
Q23: The ranking of jobs for the dispatch
Q24: A bottleneck must be fed at a
Q25: Planned and actual inputs monitor the flow
Q27: Operation overlapping is a method of expediting
Q28: Elevating the constraint means finding ways to
Q29: Bottlenecks control the throughput of all products