The planning horizon for a final assembly schedule must include time to assemble a customer's order and also should include the time necessary to manufacture the components.
Correct Answer:
Verified
Q19: A _is an order that has been
Q20: EnviroGuard manufacturing makes two garden hoses.
Q21: The planning horizon is the time span
Q22: If the total planned production of all
Q23: The production plan limits the MPS. Therefore
Q25: The production plan and the MPS uncouple
Q26: The MPS is built from forecasts and
Q27: The MPS is a plan of what
Q28: In each of the manufacturing environments -
Q29: The term "master schedule" refers to the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents