St. Augustine Corporation originally budgeted for $360,000 of fixed overhead at 100% of normal production capacity. Production was budgeted to be 12,000 units. The standard hours for production were 5 hours per unit. The variable overhead rate was $3 per hour. Actual fixed overhead was $360,000, and actual variable overhead was $170,000. Actual production was 11,700 units.
-The fixed factory overhead volume variance is
a.$9,000 favorable
b.$9,000 unfavorable
c.$5,500 favorable
d.$5,500 unfavorable
Correct Answer:
Verified
Q102: Assuming that the standard fixed overhead rate
Q107: Use this information for Zoyza Company to
Q108: The standard factory overhead rate is $7.50
Q110: The standard factory overhead rate is $7.50
Q113: Use this information for Zoyza Company to
Q114: The standard factory overhead rate is $7.50
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents