Solved

A National Organization Has Been Working with Utilities Throtughout the Nation

Question 10

Short Answer

A national organization has been working with utilities throtughout the nation to find sites for large wind machines that generate electricity. Wind speeds must average more than 12 miles per hour (mph) for a site to be acceptable. Recently, the organization conducted wind speed tests at a particular site. Based on a sample of n=133n = 133 wind speed recordings (taken at random intervals), the wind speed at the site averaged xˉ=11.2\bar { x } = 11.2 mph, with a standard deviation of s=2.7mphs = 2.7 \mathrm { mph } . To determine whether the site meets the organization's requirements, consider the test, H0:μ=12H _ { 0 } : \mu = 12 vs. Ha:μ>12H _ { \mathrm { a } } : \mu > 12 , where μ\mu is the true mean wind speed at the site and α=.05\alpha = .05 . Fill in the blanks. "A Type I error in the context of this problem is to conclude that the true mean wind speed at the site \underline{\quad\quad} 12 mph when it actually \underline{\quad\quad} 12 mph."
A) exceeds; equals
B) equals; exceeds
C) equals; equals
D) exceeds; exceeds

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents