A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 6% cement should he mix with 3 bags of 12% cement to produce a mix containing 7% cement?
A) 23 bags
B) 17 bags
C) 18 bags
D) 15 bags
Correct Answer:
Verified
Q71: Two different gasohol mixtures are available. One
Q72: A grain dealer sold to one customer
Q73: Bob fenced in a rectangular garden in
Q74: The following table shows the per
Q75: Michael's bank contains only nickels, dimes, and
Q77: The perimeter of a rectangle is 64
Q78: Twice the water flow in the hot-water
Q79: Best Rentals charges a daily fee plus
Q80: The following table shows the number
Q81: Use the given row transformation to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents