Solved

A Quality Control Engineer Is in Charge of the Manufacture

Question 49

Multiple Choice

A quality control engineer is in charge of the manufacture of computer disks.Two different
Processes can be used to manufacture the disks.He suspects that the Kohler method produces a
Greater proportion of defects than the Russell method.He samples 150 of the Kohler and 200 of
The Russell disks and finds that 27 and 18 of them, respectively, are defective.If Kohler is
Designated as "Group 1" and Russell is designated as "Group 2," which of the following tests
Will you use to find out if the Kohler method is worse than the Russell method?


A) Paired t test.
B) Z test for difference in proportions.
C) A quality control engineer is in charge of the manufacture of computer disks.Two different Processes can be used to manufacture the disks.He suspects that the Kohler method produces a Greater proportion of defects than the Russell method.He samples 150 of the Kohler and 200 of The Russell disks and finds that 27 and 18 of them, respectively, are defective.If Kohler is Designated as  Group 1  and Russell is designated as  Group 2,  which of the following tests Will you use to find out if the Kohler method is worse than the Russell method? A)  Paired t test. B)  Z test for difference in proportions. C)    test for difference in proportions. D)  Kruskal-Wallis rank Test. test for difference in proportions.
D) Kruskal-Wallis rank Test.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents