Solved

An Army Depot That Overhauls Ground Mobile Radar Systems Is PP

Question 6

Multiple Choice

An army depot that overhauls ground mobile radar systems is interested in improving its processes. One problem involves troubleshooting a particular component that has a high failure rate after it has been repaired and reinstalled in the system. The shop floor supervisor believes that having standard work procedures in place will reduce the time required for troubleshooting this component. Time (in minutes) required troubleshooting this component without and with the standard work procedure is recorded for a sample of 19 employees. The PP -value associated with the calculated test statistic is <0.001< 0.001 . At α=0.05\alpha = 0.05 , the correct conclusion is to


A) reject the null hypothesis.
B) fail to reject the null hypothesis.
C) conclude that having standard work procedures in place reduces troubleshooting time for this component.
D) Both A\mathrm { A } and C\mathrm { C } .
E) Both BB and CC .

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents