r1 = 99
Loop:
r1 = r1 - 1
branch r1 > 0, Loop halt
(a) During the execution of the above code, how many dynamic instructions are executed?)
(b) Assuming a standard unicycle machine running at 100 KHz, how long will the above code take to complete?