Since MRP systems focus on batch or lot-sized orders and JIT is focused on individual item production, the two systems are incompatible and cannot work together.
Correct Answer:
Verified
Q22: The economic order quantity (EOQ) lot-sizing technique
Q25: The lot-for-lot (L4L) lot-sizing technique minimizes carrying
Q26: Generally, determining lot sizes in MRP systems
Q28: In a net change MRP system, requirements
Q30: Lot-for-lot (L4L) is the most common lot-sizing
Q33: The least unit cost method (LUC) lot-sizing
Q34: The least unit cost method of lot-sizing
Q35: A lot-for-lot (L4L) lot-sizing technique does not
Q36: Low-level coding in MRP indicates the exact
Q37: The least total cost method (LTC) lot-sizing