You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25% of the demand during lead time.The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?
A) 42
B) 47
C) 68
D) 89
E) 94
Correct Answer:
Verified
Q47: In the textbook, Toyota's Fujio Cho identified
Q56: In setting up a Kanban control system
Q58: In setting up a Kanban control system
Q60: Which of the following is related to
Q61: Which of the following is not listed
Q62: Imagine comparing a manufacturing operation using regular
Q64: An activity where the parts that go
Q68: Which of the following is an element
Q71: In a lean production system, we expect
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents