You have been called in as a consultant to set up a Kanban control system.The first thing you do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5% of the demand during lead time.The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours.Which of the following is the number of Kanban card sets necessary to support this situation?
A) 5,000
B) 5,500
C) 6,300
D) 6,500
E) 7,000
Correct Answer:
Verified
Q22: A kaizen burst is an overfilled kanban
Q47: In the textbook, Toyota's Fujio Cho identified
Q49: Which of the following addresses elimination of
Q51: To implement lean production schedules a firm
Q56: Applying lean concepts in manufacturing balances increases
Q56: In setting up a Kanban control system
Q58: In setting up a Kanban control system
Q68: Which of the following is an element
Q73: In designing a lean production facility layout,
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents