Why it is necessary to make sure a project is in the same risk class as existing operations before using the WACC as the discount rate?
A) If a project has high risk, then it should be rejected.
B) A firm that uses its WACC to evaluate projects without regarding the risk class of the project will tend to become riskier over time.
C) Only projects with similar risk can result in positive NPVs.
D) If a project is in a different risk class then a different tax rate must be used.
E) The risk class of a proposed project is important only if it affects the firm's bond ratings.
Correct Answer:
Verified
Q315: The risk premium for a firm is
Q316: Flotation costs:
A) Reduce each of the cash
Q317: A firm's WACC is applicable to those
Q318: The overall cost of capital for a
Q319: The primary advantage of the dividend growth
Q321: Which of the following is NOT true
Q322: Which of the following is NOT a
Q323: Donaldsen Engines is comprised of three business
Q324: A firm is considering expanding its operations.
Q325: For a firm with multiple business units,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents