Safety Products currently outsources an electrical switch that is a component in its sprinkler systems. The switches are purchased for $20 each. The company is considering making the switches internally and has conducted a study to determine the costs involved. The costs below are projected annual production costs:
Assume that the company needs 15,000 of the switches, which would be produced in three batches. Assume also that the company will still be operating within the relevant range. If Safety decides to make the parts under these conditions, the total relevant costs will be:
A) $132,500.
B) $162,500.
C) $105,000.
D) $142,500.
Correct Answer:
Verified
Q26: All of the following are variables that
Q39: Which of the following costs is an
Q68: The Mighty Music Company produces and
Q69: Mountain Gear has been using the same
Q70: The Mighty Music Company produces and
Q72: Benitez Company currently outsources a relay
Q75: Hancock Company manufactures and sells two lines
Q76: ServicePro provides two kinds of services.
Q77: Clean, Inc. cleans and waxes floors
Q78: ServicePro provides two kinds of services.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents