The elimination of time spent searching for parts and tools would be associated with which of the Five-S's?
A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Correct Answer:
Verified
Q11: Waste refers to all of the following
Q12: Much of the Toyota Production System was
Q13: Excess inventories, scrap losses, rejects, and rework
Q14: Excess idle machine or operator time is
Q15: Toyota's quality control initiative was later renamed?
A)
Q17: Reduction of processing variability would be associated
Q18: Lean thinking is best described as a(n)?
A)
Q19: The most essential element in the use
Q20: In the Toyota Production System a material
Q21: SMED was first developed and used at
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents