A solid line in a material flow map would best represent?
A) Movement of a product down an assembly line
B) A product waiting to be worked on at a machine
C) Passing of quality control information to a decision-maker
D) A product exiting a process
Correct Answer:
Verified
Q18: Waiting for a product is which type
Q19: In a material flow map, a triangle
Q20: Material flow mapping involves all of the
Q21: The bottleneck process represents which of the
Q22: Cross-training workers can help?
A) Increase flexibility
B) Decrease
Q24: If a bottleneck process has a processing
Q25: DBR stands for?
A) Drum, Buffer, Regular
B) Drum,
Q26: The last step in DBR production scheduling
Q27: Identifying and improving constrained processes is the
Q28: Having _ manufacturing flexibility is desirable.
A) Increased
B)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents