Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB) . J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J2?
A) 0
B) 1
C) 2
D) 4
Correct Answer:
Verified
Q4: If I is the input rate and
Q19: Planning production that takes into account the
Q20: If a job shop is heavily congested,
Q21: The average of flow time minus processing
Q23: Which job shop dispatch rule schedules the
Q25: Two jobs (J1 and J2) are scheduled
Q26: Two jobs (J1 and J2) are scheduled
Q27: A simple, one-vehicle routing problem with the
Q28: Two jobs (J1 and J2) are scheduled
Q29: Two jobs (J1 and J2) are scheduled
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents