Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
Correct Answer:
Verified
Q1: JIT is typically applied to nonrepetitive manufacturing.
Q2: Lean production requires a "push and pull"
Q3: Uniform plant loading is a process of
Q5: Value stream mapping is used to visualize
Q6: A principle of value stream mapping is
Q7: JIT production means that we produce the
Q8: Lean production is a management philosophy and
Q9: Group technology includes the set of psychological
Q10: In the textbook, the expression "quality at
Q11: "Quality at the source" requires factory workers
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents