Calculating how many of each part were used in production and using these calculations to adjust actual on-hand inventory balances is called
A) Material requirements planning
B) Backflushing
C) Uniform plant loading
D) Master production schedule
E) Kanban pull system
Correct Answer:
Verified
Q37: Kanban means "symbol" or "box" in Japanese.
Q38: A kaizen burst is a symbol on
Q39: Value stream mapping involves materials, not information.
Q40: Preventive maintenance is emphasized in lean production
Q41: Periodic inspection and repair designed to keep
Q43: Applying lean concepts to logistics is difficult
Q44: Smoothing the production flow to dampen schedule
Q45: An inventory or production control system that
Q46: The key to lean procurement is speed.
Q47: Lean suppliers tend to charge more; although,
Unlock this Answer For Free Now!