An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?
A) Frozen window
B) Backflush
C) Level schedule
D) Group technology
E) Kanban
Correct Answer:
Verified
Q69: When implementing a lean production system, a
Q70: You have been called in as a
Q71: In a lean production system, we expect
Q72: To implement lean production schedules, a firm
Q73: In designing a lean production facility layout,
Q75: Group technology (GT) is credited with which
Q76: Which of the following is a lean
Q77: Which of the following address elimination of
Q78: In the textbook, Toyota's Tai-ichi Ohno identified
Q79: You have been called in as a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents