
At a new watch assembly plant, a job is divided into three work elements. The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF) for each element.
The standard time for this job, assuming that the allowance is 18 percent, is:
A) fewer than or equal to 1.9 minutes.
B) greater than 1.9 minutes but fewer than or equal to 2.0 minutes.
C) greater than 2.0 minutes but fewer than or equal to 2.1 minutes.
D) greater than 2.1 minutes.
Correct Answer:
Verified
Q42: Table H.1
A worker was observed for four
Q43: Table H.1
A worker was observed for four
Q44: Table H.3
A worker was observed for four
Q45: Table H.1
A worker was observed for four
Q46: Table H.1
A worker was observed for four
Q48: If a worker spends 10 hours per
Q49: Table H.3
A worker was observed for four
Q50: A time study analysis was performed on
Q51: An observer has recorded the following select
Q52: Table H.2
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents