Solved

A Work Study Has Been Conducted on a New Operation

Question 72

Essay
A work study has been conducted on a new operation with three work elements. The following times, in minutes, were obtained using the continuous method.
  
a. What is the normal time for this operation?
b. If an allowance of 20 percent is used, what is the standard time for this task?

A work study has been conducted on a new operation with three work elements. The following times, in minutes, were obtained using the continuous method.
A work study has been conducted on a new operation with three work elements. The following times, in minutes, were obtained using the continuous method.     a. What is the normal time for this operation? b. If an allowance of 20 percent is used, what is the standard time for this task?
a. What is the normal time for this operation?
b. If an allowance of 20 percent is used, what is the standard time for this task?

Correct Answer:

verifed

Verified

blured image
a. Normal time = 4...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents