Which one of the following statements about work measurement is True?
A) Work sampling is a technique to determine the proportion of time spent on different activities.
B) In determining the normal time for the cycle, using a rating factor less than one (1.0) will increase the total time allowed for a job to be performed, relative to the select time.
C) Machine standards are more difficult to develop than labor standards.
D) The time study method is most appropriate for non-repetitive jobs in which the nature of the task differs each time.
Correct Answer:
Verified
Q86: The advantage of using the predetermined data
Q87: A work sampling method is used to
Q88: A job shop manager wants to determine
Q89: A supermarket administrator suspects that idle time
Q90: Which one of the following statements about
Q92: An analyst divides each work element into
Q93: The work measurement technique that breaks down
Q94: The more frequently the activity occurs, the
Q95: With the use of the methods time
Q96: A major disadvantage of the work sampling
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents