SimQuick is to be used to simulate the following bank process:
  
Customers arrive at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes. The Line Buffer holds 6 customers. If a customer arrives and the buffer line is filled, the customer leaves. The Work Station Teller's processing time per customer is normally distributed, with a mean of 3.0 minutes and a standard deviation of 0.5 minutes. The Served Customer Buffer in the flowchart is used to count the number of customers processed during the simulation period. A 2-hour period is to be simulated and the simulation should be repeated 30 times. Determine:
a) The number of customers served during the 2-hour period;
b) The percentage of customers who arrived at the bank and left because the buffer line was full;
c) The utilization of the teller (% of time working) during the 2-hour period;

SimQuick is to be used to simulate the following bank process:
SimQuick is to be used to simulate the following bank process:     Customers arrive at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes. The Line Buffer holds 6 customers. If a customer arrives and the buffer line is filled, the customer leaves. The Work Station Teller's processing time per customer is normally distributed, with a mean of 3.0 minutes and a standard deviation of 0.5 minutes. The Served Customer Buffer in the flowchart is used to count the number of customers processed during the simulation period. A 2-hour period is to be simulated and the simulation should be repeated 30 times. Determine: a) The number of customers served during the 2-hour period; b) The percentage of customers who arrived at the bank and left because the buffer line was full; c) The utilization of the teller (% of time working) during the 2-hour period;
Customers arrive at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes. The Line Buffer holds 6 customers. If a customer arrives and the buffer line is filled, the customer leaves. The Work Station Teller's processing time per customer is normally distributed, with a mean of 3.0 minutes and a standard deviation of 0.5 minutes. The Served Customer Buffer in the flowchart is used to count the number of customers processed during the simulation period. A 2-hour period is to be simulated and the simulation should be repeated 30 times. Determine:
a) The number of customers served during the 2-hour period;
b) The percentage of customers who arrived at the bank and left because the buffer line was full;
c) The utilization of the teller (% of time working) during the 2-hour period;

Correct Answer:

verifed

Verified

The Model View of the completed elements...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents