Acme Machine is a job shop that makes specialty parts for the airline industry. Figure #1 below shows the block plan for key manufacturing operations in its current facility. Acme believes there may be a way to reduce the total distance traveled between departments. Consider the two revisions that have been suggested, based on the closeness matrix shown below the block plans. The aisles are shown by the dotted lines in Figure 1.

-Use the information in Figure K.1. Considering the current facility situation and the two suggested revisions, if Acme wishes to minimize the total weighted-distance score, which option should be selected?
A) current situation-stay with Figure 1
B) Revision 1
C) Revision 2
D) either Revision 1 or Revision 2-they have the same what is the total weighted-distance (wd) score
Correct Answer:
Verified
Q7: A block plan is a table that
Q8: Figure K.2
A department store chain is designing
Q9: Euclidean distance calculations are usually more realistic
Q10: Describe the appearance and use of a
Q11: A layout is the physical arrangement of
Q13: A block plan allocates space and indicates
Q14: Figure K.3
The information systems and operations management
Q15: Acme Machine is a job shop that
Q16: Acme Machine is a job shop that
Q17: Figure K.2
A department store chain is designing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents