Scenario 2.5
A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer. The engineer recorded ten observations and assigned the performance rating that is recorded in the bottom row of the table under the corresponding work element. All recorded times are in seconds.
-The allowance factor assigned is 20% for the data recorded. The rating factor for Element 1 is 10%, for Element 2 is 15%, and for Element 3 is 5%. What is the standard time for the three-element job?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q200: A restaurant manager tracks complaints from
Q201: An existing insurance application process requires manual
Q202: Brainstorming sessions can be effectively conducted on
Q203: An undergraduate business student studies diligently in
Q204: A group of people, who are knowledgeable
Q206: An industrial engineer observes a brand new
Q207: A pilot work study has been conducted
Q208: Develop a process chart for one of
Q209: Create a flowchart that displays the proper
Q210: How could a fishbone chart be used
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents