Krizun Industries makes heavy construction equipment. The standard for a particular crane calls for 20 direct labor-hours at $16 per direct labor-hour. During a recent period1,300 cranes were made. The labor efficiency variance was $5,200 Unfavorable. How many actual direct labor-hours were worked?
A) 31,200 direct labor-hours
B) 26,000 direct labor-hours
C) 26,325 direct labor-hours
D) 24,700 direct labor-hours
Correct Answer:
Verified
Q51: Viger Corporation has a standard cost system
Q52: The Fime Corporation uses a standard costing
Q53: Piper Corporation's standards call for 1,000 direct
Q54: Elliott Corporation makes and sells a single
Q55: The Fime Corporation uses a standard costing
Q57: At Eady Corporation, maintenance is a variable
Q58: Piper Corporation's standards call for 8,000 direct
Q59: The following standards for variable manufacturing overhead
Q60: Krizun Industries makes heavy construction equipment. The
Q61: Wadding Corporation applies manufacturing overhead to products
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents