Shipments of Product Q from a plant to a wholesaler are made in lots of 400. The wholesaler's average demand for Q is 150 units per week. Lead time from plant to wholesaler is 5 weeks. The wholesaler pays for the shipments when they leave the plant. The plant has proposed several new lead time and lot size options to the wholesaler (see table below) . If the wholesaler's goal is to minimize total cycle plus pipeline inventories, which option should the wholesaler select? 
A) option #1
B) option #2
C) option #3
D) remain with the current option
Correct Answer:
Verified
Q34: Weeks of inventory and inventory turns are
Q35: _ is an inventory measure obtained by
Q36: Efficient supply chains use low capacity cushions.
Q37: The clever wine shop owner held a
Q38: What are some financial measures of supply
Q40: A responsive supply chain typically has:
A) a
Q41: _ is essentially standardization in chunks.
Q42: Channel assembly is the process of using
Q43: _ is the process of using members
Q44: Customer clothing and the Boeing 787 Dreamliner
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents