Solved

A Brake System Installer in an Auto Factory Has an Actual

Question 151

Essay

A brake system installer in an auto factory has an actual average time of 125 minutes on her task. The performance rating of the worker timed was estimated at 110%. Practice in this department is to allow 7% for allowances.
(a) Find the normal time for the operation.
(b) Compute the standard time for the operation.

Correct Answer:

verifed

Verified

(a) Normal time = (1...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents