A grocery chain is considering the installation of a set of 4 self-checkout lanes. The new self-checkout lane setup will replace 2 old cashier lanes that were staffed by a cashier and bagger on each lane. One cashier mans all 4 self-checkouts (answering questions, checking for un-scanned items, taking coupons, etc). Checkout on the new lanes takes 2 minutes (customers bag their own orders) while checkout with the old lanes took only 45 seconds. In addition, the electricity costs for both setups are $0.05 per checkout while bagging (material) costs are $0.10 per checkout with the old system and $0.15 for the new system. The new lanes also require $100/shift in capital costs. Assume that the lanes are always in use for 8 hours per day (1 shift) and that a worker makes $10/hour.
(a) How many checkouts did the old system provide in a shift?
(b) How many checkouts does the new system provide?
(c) What is the multifactor productivity for each system?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q101: Felicien grows mirlitons (that's Cajun for Chayote
Q102: Mark's Ceramics spent $4000 on a new
Q103: Productivity is the ratio of _ to
Q104: As the administrative manager in a law
Q105: Starbucks stopped requiring signatures on credit-card purchases
Q107: Susan has a part-time business producing seasonal
Q108: The Dulac Box plant produces wooden packing
Q109: A small metal shop operates 10 hours
Q110: What is a knowledge society?
Q111: Identify the three productivity variables used in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents