Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 8 skilled workers, each of whom works9.25 hours per day. The finishing department has 5 workers, each of whom works a 6-hour shift per day. Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing. The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model. The company anticipates selling at least twice as many Lava models as Graystone models.
Use the spreadsheet below for Stone Age Surfboards to answer the following question(s) using integer constraints on variables in the optimization models using the standard Solver.
-What is the total number of hours used for fabrication?
A) 39.6
B) 34.4
C) 29.2
D) 24.8
Correct Answer:
Verified
Q2: Stone Age Surfboards is a small
Q3: What should be the value of Integer
Q4: Stone Age Surfboards is a small
Q5: Formulate and solve optimization models with
Q6: Stone Age Surfboards is a small
Q8: Use a modern software tool to
Q9: Use a modern software tool to
Q10: Stone Age Surfboards is a small
Q11: Use a modern software tool to
Q12: Use a modern software tool to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents