
Use the table below to answer the following question(s) .
Below is a spreadsheet for Stone Age Surfboards.
Assume that the finishing time for a pair of Rockwell surfboards is triangular with a minimum value of 1.4, a most likely value of 1.5, and a maximum value of 1.8 and that finishing time for a pair of Limestone surfboards is also triangular with a minimum value of 1.8, a most likely value of 2.0, and a maximum value of 2.4.The number of trials per simulation is equal to 5000.
-How often will overtime be needed if 4.5 Rockwell and 9.0 Limestone surfboards, the optimal solution, are scheduled each day?
A) more than 60%
B) more than 87%
C) more than 75%
D) more than 52%
Correct Answer:
Verified
Q8: Use the table below to answer the
Q9: Use the table below to answer the
Q10: Use the table below to answer the
Q11: Use the table below to answer the
Q12: Use the table below to answer the
Q14: Use the table below to answer the
Q15: Use the table below to answer the
Q16: Use the table below to answer the
Q17: Use the table below to answer the
Q18: Use the table below to answer the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents