Tile & Grout (T&G) contracts to resurface the insides of the pools at WaterWorld Park. T&G knows that without the resurfacing,WaterWorld will have to delay its seasonal opening. T&G does not perform as promised. As consequential damages,WaterWorld can recover
A) the cost of new pools.
B) the difference between T&G's price and the eventual cost of resurfacing.
C) the loss of profit from the delayed opening.
D) nothing.
Correct Answer:
Verified
Q33: Handcrafts & Hobbies Store agrees to hire
Q34: Cowtown Creamery,Inc.,needs a certain part for its
Q44: Porches & Verandas, Inc., agrees to build
Q47: Guido and Hal want to rescind their
Q51: Builders,Inc.,agrees to construct an office building for
Q52: Copper Conduit,Inc.,and Dependable Electric Company sign an
Q53: Dry Gulch Farms hires Elliot to repair
Q54: Meatpackers,Inc.,enters into a contract with Nemiah's Ranch
Q54: Renew Turf, Inc., enters into a contract
Q63: Leif contracts to sell his Micro Brewery
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents