Work package estimates should include allowances for contingencies.
Correct Answer:
Verified
Q16: Estimates that are typically based on estimates
Q17: If time and costs are important to
Q18: The consensus method of estimating costs is
Q19: As long as everyone in a project
Q20: Estimating the total cost of a house
Q22: Repetition of a task generally results in
Q23: A project leader is forecasting how much
Q24: What is the relationship between organizational culture
Q25: Estimates are supposed to be based on
Q26: Which of the following would best represent