Thinking holistically, suppose a new, unique project is being estimated in which there is unstable scope. There is high uncertainty in the duration and cost of each work package. Uncertainty as to which work packages to include / exclude is abundant. A project of this type has never been done before and the customer is uncertain of what they want. There are no previous similar projects or a history data base of work package durations and costs to work from. Top-down estimates of total project cost and duration do not exist. You have a dedicated team of ten seasoned project professionals working for you. You worked hard to develop a well-structured WBS for the project. Each work package (there are ten) has been assigned (by you as project manager) to exactly one project professional to develop and complete. You wish to do a bottom-up definitive determination of overall project duration and cost. The customer wants cost and duration details. Under such circumstances, how would you proceed? What assumptions would you have to make? How would you come up with estimates as to duration and cost for each work package?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q85: Under what conditions would the top-down approach
Q86: List and briefly explain two reasons why
Q87: Describe phase estimating. When should it be
Q88: Describe the ideal approach for a project
Q89: The best way to _ is to
Q90: A project to return Americans to the
Q91: Thinking holistically, suppose a never-before-done project is
Q93: Top-down methods are used for all but
Q94: Identify the drawbacks to an excessive detail
Q95: Estimates should be based on normal conditions,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents