After collecting a new sample and determining its average, which of the following should NOT be done?
A) Recalculate the control chart with the new information.
B) Plot the sample average into the existing control chart.
C) Check whether the new sample gives reason to believe that the process is not in control.
D) If the sample average is above the upper control limit, the process should be investigated.
Correct Answer:
Verified
Q59: Which of the following is not a
Q69: The process capability ratio measures the specification
Q86: Special cause variation in a process is
Q87: Excel can be used to increase the
Q91: A process capability ratio reflects the number
Q93: Possible root causes of special cause variation
Q96: The goal of statistical process control is
Q112: Which of the following statements is true?
A)
Q113: If a sample of 40 units of
Q114: Four common types of control charts include
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents