A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results:
What is the observed time for this task?
A) 80 seconds
B) 84 seconds
C) 160 seconds
D) 240 seconds
E) 400 seconds
Correct Answer:
Verified
Q171: A methods and measurement analyst wants to
Q172: A methods and measurements analyst for Timepiece,
Q173: The owner of Kat Motel wants to
Q174: A methods and measurements analyst needs to
Q175: A methods and measurements analyst needs to
Q177: A disadvantage of teams is:
A)higher quality.
B)higher productivity.
C)greater
Q178: The owner of Kat Motel wants to
Q179: The owner of Kat Motel wants to
Q180: The owner of Kat Motel wants to
Q181: Which of the following is not considered
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents