A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results:
What is the standard time for this task if the employee worked at a 20 percent faster pace than average, and an allowance of 20 percent of the workday is used?
A) 20 seconds
B) 24 seconds
C) 25 seconds
D) 28.8 seconds
E) 30 seconds
Correct Answer:
Verified
Q156: The technique which can be used to
Q157: In a stopwatch time study, adjusting the
Q158: A job had an observed time of
Q159: Which of the following is not an
Q160: A job has an observed cycle time
Q162: A methods and measurement analyst wants to
Q163: A methods and measurements analyst for Timepiece,
Q164: A methods and measurements analyst needs to
Q165: A methods and measurements analyst for Timepiece,
Q166: The design of work systems typically involves:
(I)work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents