The ratio of actual output to design capacity is:
A) design capacity.
B) effective capacity.
C) actual capacity.
D) efficiency.
E) utilization.
Correct Answer:
Verified
Q144: The decision to outsource opens the firm
Q145: Which of the following is not a
Q146: Given the following information, what would efficiency
Q147: Outsourcing some production is a means of
Q148: Which of the following would tend to
Q150: Allowances for which of these factors would
Q151: Utilization is defined as the ratio of:
A)actual
Q152: Which of the following is the case
Q153: Which of the following is a key
Q154: Unbalanced systems are evidenced by:
A)top-heavy operations.
B)labor unrest.
C)bottleneck
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents