Which of the following does not contribute to reduced setup time and cost?
A) standardized setup tools
B) standardized setup equipment
C) custom setup procedures for each product
D) use of multipurpose equipment or attachments
E) use of group technology
Correct Answer:
Verified
Q79: _ is known as being a proactive
Q80: Ideally, preventive maintenance will be performed
A)after a
Q81: In the Toyota Production System, waste and
Q82: The Five S's do not include
A)Sort.
B)Straighten.
C)Sanitize.
D)Sweep.
E)Standardize.
Q83: Which one of the following is not
Q85: Although transitioning to a lean system can
Q86: The ultimate goal of lean operations is
Q87: The approaches used in lean systems to
Q88: In the lean philosophy, the ideal lot
Q89: A lean-systems method of asking questions about
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents