The amount of inspection needed depends on _____ and _____.
A) the amount of automation; the reliability of inspectors
B) the quality of the supplier; the target market of the process
C) the costs of inspection; the costs of passing on defective items
D) where in the process the inspection occurs; the volume of the process
E) the cost of the item being inspected; the use of the item being inspected
Correct Answer:
Verified
Q45: Acceptance sampling, when it is used, is
Q46: The assurance that processes are performing in
Q47: A p-chart would be used to monitor
A)average
Q48: Statistical process control charts are not really
Q49: Control limits are based on multiples of
Q51: A c-chart is used for
A)means.
B)ranges.
C)percent defective.
D)fraction defective
Q52: Inspection is a(n)_ activity.
A)prevention.
B)capability analysis.
C)flawless
D)corrective.
E)appraisal.
Q53: The best way to assure quality is
Q54: A control chart used to monitor the
Q55: A control chart used to monitor the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents