Acceptance testing should never be done by a ______________________.
A) medical physicist
B) manufacturer's representative
C) QC technologist
D) radiologic engineer
Correct Answer:
Verified
Q4: The first step of the QA recommended
Q5: A quality control program is for _.
A)
Q6: The minimum HVL for an x-ray machine
Q7: The x-ray field must center accurately to
Q8: A quality assurance program monitors _.
A) films
B)
Q10: It is acceptable to perform a(n) _
Q11: Most quality control testing on radiographic equipment
Q12: When a light in a viewbox is
Q13: Filtration is measured with _ measurements.
A) caliper
B)
Q14: Comparing the mR output at 50 mA
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents