When suppliers are unable to offload at the docks and the bump-in process has been delayed, this is an example of:
A) Poor logistics planning
B) Bad traffic
C) An inability of truck drivers to stick to offload quick enough
D) A concern for council
Correct Answer:
Verified
Q1: Utilities do not include:
A) Data cables
B) Electricity
C)
Q2: When considering compliance when selecting a catering
Q3: If you needed advice on ecological or
Q4: Infrastructure requirements are most challenging for:
A) Built
Q5: If an outdoor event is licensed, which
Q7: Incident report forms are useful for which
Q8: Licenses would NOT be required by:
A) Forklift
Q9: Infrastructure does NOT include:
A) Fencing
B) Toilets
C) Seating
D)
Q10: An event operations manual:
A) Is not necessary
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents