When a main bonding jumper or a system bonding jumper is a screw only, the screw must be identified with a ____ finish that is required to be visible with the screw installed.
A) red
B) yellow
C) blue
D) green
Correct Answer:
Verified
Q1: Three-phase, 4-wire, wye-connected systems are created by
Q2: _ locations are those that are hazardous
Q3: If a grounding electrode conductor is connected
Q4: When using a main bonding jumper wire
Q6: Ground detection on ungrounded systems has direct
Q7: The term _ is defined in NEC
Q8: If overcurrent protection is not provided at
Q9: When one of the system conductors is
Q10: The _ bonding jumper runs from the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents